SI Project Checklist Guide
From kickoff to closeout, here are the items most often missed on real SI projects, organized phase by phase. Easy PMS Checklist turns this exact flow into a ready-to-use template.
Why use a checklist
SI projects involve many stakeholders — the client, the vendor, subcontractors, and business departments — and each phase, from contracting to requirements, design, development, testing, and go-live, has its own documents and approval steps to track. Especially on smaller projects run by one or two PMs/PLs across multiple phases at once, it's common for something everyone assumed “someone else handled” to slip through with no one actually owning it.
A checklist is the simplest, most effective way to prevent this kind of gap. The 10 phases below reflect a flow that repeats across real SI projects, and map one-to-one to Easy PMS's built-in template.
Phase-by-phase checkpoints
Kickoff Preparation
This phase spans from contract signing to the actual start of work. Documenting purpose, scope, and stakeholders in a kickoff report and project charter gives you a paper trail if disputes arise later. Lock down the PM/PL's reporting line and emergency contacts before the kickoff meeting to reduce early miscommunication. Dev environment account requests often take a while to process, so start those first.
Contract & Scope Management
If you don't clearly separate the RFP and contract scope in writing, arguments about 'is this in scope or not' are almost guaranteed mid-project. Agreeing early on a change management process — who approves changes and how they flow into schedule/cost — sets you up to handle change requests (CRs) systematically. Liquidated damages and warranty terms are the first things to check in the contract.
Requirements Definition & Analysis
Defining requirements without an as-is analysis of the current system tends to produce designs that clash with existing business processes. Building a requirements traceability matrix (RTM) early lets you trace any requirement forward into design and test later. Non-functional requirements like performance, security, and availability rarely come up in business interviews, so track them separately.
Design
Screen designs, ERDs, API specs, and architecture documents all need client review before development starts. Starting development before design sign-off turns any later design change into rework. Security design (auth, encryption, access control) depends on whether personal data is involved, so confirm that scope early.
Development
Coding conventions and a branching strategy are cheaper to agree on before multiple developers are on board. Setting up CI/CD early means you get the benefits of automated deployment by the time testing starts. Weekly progress reports should compare actual progress against the WBS so schedule slips get caught early.
Testing & Quality
Integration testing and UAT serve different purposes: integration testing catches issues between modules, while UAT confirms the business side can actually use the system for real scenarios. Without a defect log tracked by severity, it's hard to know how many unresolved defects remain right before go-live. If the system handles personal data, confirm whether a security vulnerability check (e.g. penetration testing) is required.
Go-live & Transition
Every go-live plan needs a rollback plan. Data migration should include a post-migration validation step (record counts, spot-checking sample data), and a go-live rehearsal lets you verify the actual scenario beforehand. Run a hyper-care period of focused monitoring right after launch to respond quickly to early incidents.
Deliverable Management
Kickoff/interim/completion reports, final design documents, test results, manuals, and source code are all evidence for the client's acceptance review. Maintaining a deliverable baseline list from the start avoids scrambling to find missing deliverables at closeout.
Closeout, Acceptance & Handover
Agree on acceptance criteria with the client in advance — the project isn't officially closed without a signed acceptance certificate. Share system architecture and issue history when handing off to the operations/maintenance team to reduce early confusion. Revoking dev accounts and transferring ops accounts is a security step that also belongs in this phase.
Risk, Issue & Communication Management
A risk register and issue log only add value if they're kept up throughout the project, not just at the start. Regular status meetings and minutes become the record of accountability with the client, so keep writing them even when it feels like a formality.
How to use Easy PMS Checklist
- From the home screen, tap “Create a new project checklist” and enter basic info like project name, client, and dates — the 10-phase template above (about 60 items) is copied in automatically.
- Once created, you get a 6-character share code. Send it to your team and they can access the same checklist without logging in.
- On the checklist screen, track progress per category and check off or hide completed items.
- If the template is missing something specific to your project, add, edit, or delete items freely.
- Next time, just enter the share code on the home screen to jump straight back into the same project.
FAQ
Q. What if I lose my share code?
A. There's currently no way to recover a lost code, so please save it somewhere safe when you create the project.
Q. Is my data safe without a login?
A. Anyone who knows the share code can access and edit the data — it's not access-controlled beyond the code itself. Manage who you share the code with carefully if the project shouldn't be public. See the Privacy Policy for details.
Q. Can I adapt the template items to our company's process?
A. Yes. You can freely add, edit, or delete items per project — the template is just a starting point, not something you have to follow exactly.
Have more questions? Reach out via the About & Contact page.